Ground floor warehouse with a total surface area of 1,200 sq.m in the Heraklion Industrial Area in Crete.
The project involved the construction and installation of an extension to a ground floor warehouse, in order to increase the company's production capacity and to house a 25 ton capacity crane bridge.
DESIGN, CONSTRUCTION, ERECTION
COMPLETED
SYCHEM SA
HERAKLION INDUSTRIAL AREA, CRETE
2018
120 TN
Learn moreIndustrial building with total surface of 1.100sq.m in Glyfa, Chalkida.
The project involved the planning, construction and installation of a metal building with a double hipped enclosed roof, infrastructure for a 25-ton capacity mobile gantry, as well as the roof overlay and sidewall panelling and the permanent metal form-work of the office space loft structure.