Manufacture and installation of a metal structure of a new building, 18,00 by 18,00 meter, which contains a duo pitched roof with an 11 meter ridge.
CONSTRUCTION, DESIGN
IN PROGRESS
ALUMINCO SA
INOFYTA, BOEOTIA
2021
265 TN
Learn moreConstruction of an egg collection, candling, sorting and packaging facility with a surface area of 2.220 sq.m in the Ioannina region. The building consists of one ground floor and one two storey section. The project involved the planning, supply and erection of the roof overlay, exterior side panelling and interior panelling, as well as internal configurations required for sanitation purposes.